Quantity | Unit | Item Description | |
1 | roll | THHN 2.0mm squared (150m) | |
12 | pcs | RJ45 Metal (tough connector) | |
5 | pcs | Flexible hose 3/4" | |
110 | pcs | PVC Pipe 3/4" | |
25 | pcs | PVC Pipe 1" | |
30 | pcs | PVC Elbow 3/4" | |
10 | pcs | PVC Elbow 1" | |
40 | pcs | PVC Adaptor w/ locknut 3/4" | |
12 | pcs | PVC Adaptor w/ locknut 1" | |
100 | pcs | PVC Utility box | |
12 | pcs | Amko box with blank plate | |
4 | cans | PVC cement | |
7 | pcs | Cable duct 4x4 | |
1 | pcs | Outdoor pullbox gauge 16 10 x 18 x 18 | |
4 | kgs | G.I wire #16 | |
10 | pcs | Dyna bolt 5/16 | |
1 | pcs | Aluminum Steel strap | |
20 | pcs | Aluminum Steel strap buckles | |
2 | pcs | UB-AM | |
4 | pcs | Information Outlet | |
4 | pcs | Faceplate 1 gang | |
4 | pcs | Cat5e 1m UTP Patchcord | |
4 | pcs | Cat5e 3m UTP Patchcord | |
12 | pcs | Information Outlet | |
6 | pcs | Faceplate 1 gang | |
3 | pcs | Faceplate 2 gang | |
12 | pcs | Cat5e 1m UTP Patchcord | |
12 | pcs | Cat5e 3m UTP Patchcord | |
2 | pcs | High performance airMax ac Bridge | |
Frequency: 5150-5875 MHz | |||
Output power: 25dBm | |||
Gain: 19dBi | |||
1 | pcs | Industrial Weather proof enclosure | |
*with colling fan, cable glands, power outlet | |||
1 | pcs | Uninterrupted power supply (UPS) 625VA | |
*625VA, 230V, AVR, Floor, Universal socket | |||
*efficiency at full load: 65.3% | |||
*Alarms: Visual (LED) and audible alarms | |||
*adjustable sensitivity and transfer voltage: Low, | |||
Medium (default). High | |||
1 | roll | Outdoor STP CAT5e Cable | |
Outdoor carrier-class shielded cable that features | |||
Anti-crosstalk divider | |||
305m/roll | |||
120 | mtrs | 50pairs UTP Cable | |
4 | pcs | Volition Cat5e 50 pair 110 block w/ leg, holder label | |
6 | roll | Cat5e UTP cable | |
1 | pcs | 2 ft Data Cabinet (Wall mounted) | |
with standard 19" rack mounting | |||
4 outlets 3 prong 220V power strip | |||
1 | pcs | 1 Patchpanel (loaded) Cat5e 24-port | |
1 | pcs | 1 wire organizer | |
1 | pcs | Installation, cable pulling (rough-ins), termination, | |
configuration, commisioning , labor, on-site project | |||
Management training, transportation | |||
accomodation, equipments mobilization |
Approved Appropriation: Php 591,885.00