Item | Quantity | Unit | Item Description | |
Use for replacement of Mechanical Pump: | ||||
1 | 1 | lot | Pull out of pump from pit and install back | |
the new one | ||||
2 | 1 | lot | Reconditioning of angle gear replace | |
bearing, oil seal and shaft of gear | ||||
3 | 1 | pc | SS shaft 1 3/4" dia T 304 | |
4 | 1 | pc | Propeller bronze 15" dia 3 blades | |
5 | 3 | pc | Tiger bronze busing | |
6 | 3 | pc | Housing of bushing | |
7 | 8 | pc | Spokes | |
8 | 1 | pc | Column pipe 15" dia x 9' 8mm thickness | |
9 | 1 | pc | Tee column 15" dia with inner and outer cover | |
10 | 2 | pc | Flages 18" dia x 15" dia with holes | |
11 | 1 | pc | Strainer | |
12 | 1 | lot | Assorted capscrew | |
13 | 1 | lot | Paintings | |
14 | 2 | pc | Couplings | |
15 | 1 | pc | Manhole | |
16 | 1 | lot | Flange bearing and housing | |
Approved Appropriation: Php 435,000.00