Quantity | Unit | Item Description | |
10 | month | Vertigrow Maintenance System | |
(4 greenwall garden systems) | |||
inclusive: | |||
a. Deployment of vertigrow technicians for once/twice | |||
a week check-up as needed. | |||
*during on-going automatic irrigation settings base on check-up. | |||
*during a non-irrigation date | |||
-manually overriding irrigation if moisture is low. | |||
-re-programming irrigation settings base on weekly check-up. | |||
*inspection of plants for overall health. | |||
*inspection of pests or diseases. | |||
*monthly reporting and documenting weekly status of greenwall. | |||
b. Continous plant medium replanishment and soil conditioning. | |||
c. Vertical garden fertilization. | |||
*weekly dosage or as needed. | |||
*foliar spray to streghten leaves or as needed. | |||
d. Pruning/Trimming | |||
*to allow plants to grow new leaves and be healthier. | |||
*help rejuvenate the plant and locate dying ones. | |||
e. Automatic plant replacement. | |||
*allocation of 50pcs monthly plant replacement. | |||
f. Drip irrigation system. | |||
*fix irrigation problems. | |||
*parts will be charged upon usage. | |||
g. Deployment of vertigrow technician within max. Of 48 hrs | |||
timeline-upon call for problems | |||
From: May 2018 to Feb. 2019 | |||
For PLV Bldg. | |||
Approved Appropriation: Php 210,000.00